Many thanks to all that helped make the Carriage Trail a reality.
Proctor Students
Proctor Students
Lunch break
Dave cutting over grown logging road
Bill prepping for VYCC
Heading out to work on mud hole
Augie helping us with a mud hole on the Carriage Trail
Getting over water bars
Very muddy
Mud was getting hydralic
Tim cleaning a mud hole by hand
What it looked like before we started
Final grade getting approval
Our drainage ditch is working
Spirit bus moving VYCC crew around
2013 VYCC moving in
Water for VYCC
Getting ready to commune with mosquitoes
2013 crew moved this big flat rock by rolling it on logs.
2013 crew building rock burrito
Camp for 3 weeks
Cold drinks at the end of the day
Rock Cairn
12 inch ash log done with axe
Winding through the woods
2013 VYCC crew having fun with photographer
VYCC chopped this ash with a small axe
Breakast before heading out
VYCC master piece
Turnpiking
A place to hangout away from bugs
Reynolds Reservior
Reynolds Reservior
Community Crew #18
Fantastic bench but by Community Crew #18 on the Proctor side
VYCC moving in to Muddy Pond
2014 crew
Lauren was great at supplying goodies
2nd year Tim was back working on the Carriage Trail
Bonus 3 week crew working on Carriage Trail
Trail moved over out of wet spot
Crew working hard
Shoring up waterbar on steep hill
Great signs
Shelley and Lauren pulling wagons with weed whackers
Pulling weed whacker behind bikes on trailer
Before weed whacking
After weed whacking
Lauren weed whacking
Weed whacking Carriage Trail
Muddy Pond in winter
Grand Opening on Rutland side
Leonard helping with sign post
Proctor side ribbon cutting
Crew that hiked from Rutland to Proctor
Wayne grilling
Reynolds Reservior
Kim leading the way to Proctor
Bob Parker hiking all the way over to Proctor
Mud ruts from riding too early in the spring
Evening at Muddy Pond
Joel finishing Carriage Trail kiosk
Columbine
Alec checking out the new armoring on Resting Brook
Karin supplied grinders to the crews